In the early '70s another drillship, the Discoverer 511, was equipped with one of the first sophisticated computer and monitoring system that allowed drilling personnel to perform on-site calculations used for drilling optimization. Safety of Mobile Offshore Drilling Units, Offshore Technology Conference, 22-24 April. Since the oil and gas bust of the mid-1980s, there has only been one spurt of new building, and that was in the late 1990s. The Curse of Oak Island: Drilling Down Season 9 is yet to be announced by History Channel Current Show Status. Allows the standard interface to work at any airport including on site and off site, ensuring product and service consistency. This new drillship would feature a first-ever anchor mooring array based on a unique turret system. It drilled in water up to 350 ft. Drillships Our Fleet Filter Status Report Download Take Virtual Rig Tour VALARIS DS-18 Design: GustoMSC P10,000 Water Depth: Ultra-Deepwater: 7,500' + Region: North and South America Special Capabilities: MPD Equipped Maximum Water Depth: 12,000 ft. Download The vessel was named Discoverer I. With this approach, a stable platform was available from which to drill. Reduces costs for airlines and airports by simplifying the development, installation, support and ongoing maintenance of vital passenger processing and operations. Many of the third-generation units were upgraded in the 1990s to even deeper water depth ratings with more capabilities and became fourth-generation units. The well spudded on 29th May 2012 in 2,186m of water and was drilled by the drillship 'Deep Sea Metro 1' to a total depth of 5,544m subsea in 57 days. T. F. Marucci and D. E. McDaniel 1970. By 2018 several operators started making plans to explore the next frontier of ultra-deepwater drilling and decided to design and construct a rig capable of drilling in 20,000 psi environments. Fig. I'm sort of glad I did, because the work on these vessels was often very challenging. 9) was converted from an old semi MODU. Fig. The company also states that Flash-based content will be blocked from running in Adobe Flash Player after the EOL date. Nice to understand the evolution of the drilling ships! Heading was from a gyrocompass. Direction and engine speed were to be controlled manually from a central location. They could carry much larger deck loads ( 7,000 kips), They could drill in deepwater depths ( 400 ft), They had more capable drilling machinery (7,500-psi high-pressure mud systems and 750-ton hoisting equipment), They had extended cantilever reach (at least 70 ft.), They had larger cantilever load ratings of double or more the earlier units (some > 2,500,000 lbm), In a semi hull, the wave train can move through the transparent hull without exciting it to heave, roll, and pitch, unlike a mono hull. The first drillship was the CUSS I, designed by Robert F. Bauer of Global Marine in 1955. Whether platforms are physical or virtual, there will be standard interfaces presented to the application so that the concept, first introduced by CUPPS and CUSS, of "certify on one platform, run on many" will remain as a core principle. 4.1. 2019. I followed the spill recovery closely, and never heard DP mentioned. Reading and Bates delivered the Deepwater Pathfinder in late 1998, with the sister vessels Deepwater Frontier and Deepwater Millennium following at 6 month intervals. These drillships incorporated the first generation of Dynamic Positioning systems (DP1). Field 6 (Field Size of variable size field): there was a change in the Implementation Guide where the previous version stated: Items 8 to 118, Plus Item 4, and now Size of data used within the subsequent conditional and airline individual fields (items 8 to 254, plus item 4) in ASCII-printed hexadecimal. In 1961 Global Marine started a new drillship era. Most of the first-generation units could sit on bottom or drill from the floating position as a hedge against unemployment. Click here to find personal data about David Cuss including phone numbers, addresses, directorships, electoral roll information, related property prices and other useful information. These barges were rectangular with a narrow slot in the aft end of the barge for the well conductor. Offshore drilling typically refers to the discovery and development of oil and gas resources which lie underwater. The 3rd generation of MODU's (including semisubmersibles) can be located in the early '80s. Water depth records continue to fall, and big new rigs rated for 12,000 feet of water cost $600 million. With a 37,000 ton payload, a 6800 sq.m deck areaand the capacity to accommodate 250 people on board,the rig is designed for 90 dayautonomy, which means it can work for three months in a remote location without the needfor resupply. Fly Net Zero is the commitment of airlines to achieve net zero carbon by 2050, bringing air transport in line with the Paris agreement to limit global warming to 1.5C. One drilling contractor, Global Santa Fe, monthly publishes a percentage number related to day rate and cost of building a new unit. They could only drill to a designated core depth with the understanding that if they drilled into any oil and/or gas sands, they would stop, set a cement plug, and pull out of the core hole. Important timelines for CUSS 2.0. All rights reserved. Of course there were no anchored vessels there! Unit shown is the Ocean Voyager, drilling in the North Sea in the early 1970s. History. The IATA Strategic Partnership Program offers the Common Use area of involvement. This page was last edited on 2 June 2015, at 12:42. Needs and technology evolve continuously. The Variable Deck Load of 8,500 ton was almost twice the capacity of other 4th generation rigs thus providing high autonomy to operate in remote locations. Bosch 2608584642 Progressor 64mm Diameter 40 mm Drilling Depth Hole Saw. It was in the '80s when Far East Levingston Shipbuilding Ltd. (FELS) built the Glomar RF Bauer. Howe, R.J. 1966. In a post-Covid era, the travelling population will continue to increase, and airlines and airports will be required to adapt their processes to maintain the safety and the security of their operations whilst improving passenger throughput. The whole passenger process has changed and continues to evolve. The Deepwater Atlas is the first of its kind 8th generation drillship that will offer 20,000 psi well control capabilities and a 3.4 million pound hoisting capacity. Copyright . At the same time, there is a need to maintain legacy infrastructure to continue to provide full-service options for some passengers. Drillships are just one way to perform various types of drilling. My Life and Times. I suspect the later drillships don't have that challenge. In the early 1970s, a new, second-generation semi was designed and built with newer, more sophisticated mooring and subsea equipment. The Sea-crets of Oak Island March 28, 2022 42min TV-PG Subtitles Subtitles English [CC] Audio languages Audio languages English Matty Blake dives in head first to investigate under water points of interest off the shores of Oak Island, in search of clues that might help solve the 227 year old mystery. 1: Drilling Down on Season 3 : Nov 10, 2015: 2: Drilling Down on "Columbus Day" Jan 5, 2016: 3: Drilling Down on "Silence In The Dark" Definition of cuss_1 verb in Oxford Advanced Learner's Dictionary. Very good article Hugo! 8) in the late 1970s and early 1980s. "Glomar Challenger unlocks the earth's mysteries" On Location (Winter 1984), 8-12. There is now an expectation on airports and airlines to provide passengers with multi-channel self-service and accessible capabilities (i.e. #S9 E20 "The Curse of Oak Island" Season 9 Episode 20 (History) EngSubs HD. That means that CUSS 1.0, CUSS 1.1 and CUSS 1.2 are valid revisions of the TS. It has been 60 years since Global Marine Drilling Company commissioned the CUSS I in 1956. The unit, which was a conversion from an inland drilling barge, had two stability pontoons, one on each side of the barge, that hydraulically jacked up and down as the barge was submerged and pumped out. I just missed the pelican class as Christian did. 11). Ultra deepwater wells costing more than $50 million are common, and some wells have cost more than $100 million. Robert F. In 1961 Global Marine started a new drillship era. It was to have a 250-horsepower, direct engine-driven thruster mounted near each of its four corners. Courtesy of Exxon- Mobil Development Co. Some large platforms may have two drilling units on them. Offshore drilling presents environmental challenges, especially in the Arctic or close to the shore. This year is the 50th anniversary of DP, and I was there at the beginning. Drilling the Well 4.2. After trying for an hour to hold station unsuccessfully with manual control, the automatic system was turned on, the dot on the oscilloscope moved to the center of the screen and held steady. He used the pier to support a land rig next to an existing field. Thruster direction and speed were each to be controlled separately and manually from the bridge. Starting in the late 1980s, a number of drilling contractors upgraded rigs built in the 1970s and early 1980s to deepwater depths, more severe environmental ratings, and better drilling abilities rather than building new units. Once on location, the legs were electrically or hydraulically jacked down to the ocean bottom, and then the hull was jacked up out of the water. cuss 1 drillship. As a consequence to the above announcement, application suppliers and providers cannot expect a newer Flash or Shockwave version than the latest one released by Adobe in 2020 and distributed on a CUSS platform. The purpose of this technical specification is to standardize data exchange supporting Common Use self-service bag drop through the use of web services technology. In 1962, The Offshore Company elected to build a new type of drillship, larger than that of the Glomar class. The objective is to allow an airline to focus on the business process made available by a given service provider at a given airport. API-66-120. 51:30. 8Le Tourneaus 116C cantilevered jackup with drill floor cantilevered over a fixed platform. These pontoons provided the necessary stability for this operation. CUSS 1 had been made from an old war surplus YF barge at 3,400 LT displacement. However, the major boom of the late 1970s and early 1980s has been unmatched in numbers of rigs built. Some drilling contractors have successfully built their entire business plan around conversion instead of new build. We use cookies to give you the best experience on our website. 6With a De Long-type jacking system, the Gus I, built in 1954 and rated for 100-ft water depth, was the forerunner of the modern jackup. I started on the Neddrill II in Hudson bay 1985, at that time she was approximately 10 years as a drillship from a converted bulker and still operating, although a lot transformed. By the end of the first decade the Enterprise Classdrillships were enhanced to allow the operation inwater depths up to 12,000 ft (3,657 m)using 1815,000 psi BOP and 21 OD marine drilling riser as in previous versions. Simulated hardware can now be used to facilitate platform compliance for complex devices such as baggage drop and electronic payment. The first offshore drilling unit to implement subsea well control. CUPPS describes the range of services, specifications, and standards enacted to enable multiple airlines, service providers to share physical check-in or gate podium positions (either simultaneously or consecutively). 7Le Tourneaus Scorpion built for Zapata (now Diamond Offshore Drilling Inc.) in 1956 for 80-ft water depth as an independent-leg jackup. Drilling and Production Practice. But observant people could also see that they are still clumsier than they should be, and many provide a view that is in poorer resolution and perspective than it should be. I worked as DPO at SC Lancer former Ben Ocean Lancer. They ordered several self-propelled drillships each with a rated centerline drilling of 20,000 foot-wells in water depths of 600 feet. Direction and engine speed were to be controlled manually from a central location. DOT final rule on kiosk accessibility that became effective on December 12, 2013. Skip to main content. Enough power to run all the new equipment. > Purchase the 2022 ITPSDownload the IATA ITPS brief (pdf), IATA Technical Peripheral Specifications Publication. [2], The Breton Rig 20 (Fig. Then came the Ocean Driller, the first semi built from the keel up (Fig. Winner's Curse Page 1 . Section 2.2.4 provides additional information and examples related to certain data elements contained in the standard for implementation purposes: US company Adobe has announced the End of Life of the Flash Player. Houston, Texas: ODS-Petrodata. The ship succeeded in penetrating to Layer 2 of the oceanic crust, recovering basalt,. Many others included pipe lay and construction crane vessels and dive support vessels. 3Western Explorer, the first (1955) floating oil- and gas-drilling MODU that used subsea well control. Movie Coverage Trailers. The CUSS TSG is working on the development of the next CUSS Technical Specifications, version CUSS 2.0. Functional layouts designed with a strong focus on efficiency are the normnow. Eureka had her new control system installed just before leaving the shipyard. The lead cross and the red gemstones are only the latest artifacts discovered in the 223-year-old treasure hunt. 7), which had independent legs with spud cans. Legacy InternetExplorer-based websites and applications will continue to work within Microsoft Edge's built-in InternetExplorermode. The CUSS Iwas the first drillship designed by Robert F. Bauer of Global Marine and in 1957 had drilled its first well in 400 ft (122 m) water depth. As part of Project Mohole, in 1961 the drillship Cuss 1 was fitted with four steerable propellers. In 1938, a field was discovered offshore Texas. The large moonpool, which is 141 ft (43 m) long, facilitates multipleoperations. Get exclusive videos, pictures, bios and check out more of your favorite moments from seasons past. Their common purpose is to steer the industry and establish standard rules for the functioning of IATA mechanisms, while promoting the collaboration between the airlines in enriching the airline industry. The Le Tourneau Co. built for Zapata Corp. the first lattice-leg jackup, the Scorpion (Fig. The first tenders were shaped like barges, but some are now shaped like ships for better mobilization speeds. The baggage drop device has the status of "Defined, Required" in the latest CUPPS 1.04 specification and can be implemented based on the. In summary, drillships will continue to evolve in order to be able to operate in deeper water depths and to reach deeper zones below the mudline. When a hole is drilled by the first drilling system, the second drilling system is used for making up casing and tubing strings in advance. As innovation propels the offshore energysector into new areas, the involvement of all the industry players is extremely important to make sure safety, reliability and efficiency keep pace as technologies emergeand mature. Pic credit: History. Launched in 1956 it was following in the footsteps of pioneer floating offshore rigs such as the Western Explorer and the. DOT rule. In other words, it is the sum of the length of items 15, 12, 14, 22, 16, 21, 23, 31 and 32. These business requirements do not recommend any technology or provider and only seek to establish the key components of an effective industry card payment for this specific environment. The first one was named CUSS II and was built by a Gulf Coast shipyard, the vessel was almost twice the size of the CUSS Iand became the worlds first drillship built as new construction which set sail in 1962. 7.7 (15) Rate. It is very difficult to justify wells that cost this much given the risks involved in drilling the unknown. We needed an automatic control system to hold position and heading, but nothing like that existed. The shape and size of the first semis varied widely as designers strived to optimize vessel motion characteristics, rig layout, structural characteristics, VDL, and other considerations. The lower hull of the semi is below the water at a deeper draft. 6) shows an example, the Gus I) were the first jackups built in 1954. S6, Ep3. Technologically obsolete means that the unit needs to have: 2. June 25, 2010. The details of the data definitions using the Aviation Industry Data Model (AIDM) semantic model ensures that the data can be reused and is interoperable. HISTORY. Rig Positioning Problems . But, I also suspect the new generation are the wrong ones to become proficient with the old technology. The unit averaged 8.93 days per well and drilled an average of 324 ft/D. Acquire the new skills needed to meet the challenges of the road to recovery, from safety management to emergency planning and risk management. Shop by category . The Oak Island team spot strange bubbles while drilling underground. Like the earlier vessels, she drilled with bare drillpipe and no riser or mud circulation. Best Hugo, Ronaldo Sunrise Offshore Comrcio Varejista. The largest was Transoceans Enterprise, 100,000 long tons with six 7,000 horsepower thrusters. 02 Dc 2020, par dans carolina conference teams dans carolina conference teams The rigs were able to conduct concurrent drilling activities on adjacent wells. Recovering over 40 feet of basalt, the tests were deemed highly successful. Especially with regard to vessel motion. An addendum to the CUSS version 1.5.1 is also available to provide a standard interface to support biometric requirements on a CUSS platform. The concept was that delivery and cost could be cut in half compared with a new build. We also use cookies for advertising purposes. The fleet in 2003 stood at approximately 390 jackups, 170 semis, 30 ships, and 7 submersibles. This unit is on a TLP in the GOM. There is an increasing demand for guidance on what are the desirable components of a solution that would support the "multi-merchants/multi-acquirers" business model of common use positions at airports which are shared by several airlines. During tows, the substructure was skidded to the metacenter of the hull, but during drilling operations, the substructure was skidded aft over the slot. Fig. TheDS3810of Friede & Goldman is designed for operation in 12,500 ft (3810 m) water depthwith 40,000 ft(12,000 m) drilling depth capability. Drillship depicted is the Cuss 1. There is still room for improvement. View the officialDirective of the European Parliament and of the Council. You must log in to edit PetroWiki. A 100% rating means new units can be built profitably; however, the percentage number has lingered in the 40 to 60% range over the last 15 years or so, with spurts into 80%. Initially, two barges that were eventually joined permanently, but the unit was lost in a storm. Synonyms for CUSS: swear, curse, cussword, profanity, expletive, language, swearword, vulgarism, epithet, obscenity A drillship has greater mobility and can move quickly under its own propulsion from drill site to drill site in contrast to semi-submersibles and jackup barges and platforms. Anyway for me I 'm glad I was old school. It's offensive or has swear words. The new project, called the Ocean Drilling Program (ODP), continues exploring Earth's history beneath the oceans. The consensus is that the offshore drilling business will continue to grow, with emphasis on technical breakthroughs to reduce drilling costs. Wed Jan 12, 2022 at 10:25am ET. Later, barges were posted on a lattice steel structure above the barge, allowing them to work in deeper water depths by submerging the barge on the bay bottoms. In addition, the culmination of the chip roll out will lead to the card industry decommissioning ultimately the magnetic stripe technology. The vessel was called the Eureka. Access the current status of CUSS 2.0. Although CUPPS already allows the use of mobile devices, Wi-Fi networks and even remote access for airlines to airport peripherals, the following new features are included in the CUPPS 1.04 specification: While new features were added, part of the work concentrated on streamlining the existing specification. Steve Cuss 1 year ago. Help with editing, Content of PetroWiki is intended for personal use only and to supplement, not replace, engineering judgment. Drillships have the ability to save time sailing between oilfields worldwide. The technology used to support the passenger processes and enhance passenger experience at, and off-airport need to be assessed continuously and updated on a regular basis. 10Worlds first semi MODU, Bluewater No.1, converted in 1961/1962 by Shell Oil from a submersible hull. Data exchange supporting Common use self-service bag drop through the use of web services technology now. 1961 the drillship CUSS 1 had been made from an old war surplus YF barge at LT... Now Diamond offshore drilling business will continue to provide full-service options for some passengers challenges of the drilling ships ). Made available by a given service provider at a given airport legs spud!, at 12:42 mm drilling depth Hole Saw IATA ITPS brief ( pdf,. Initially, two barges that were eventually joined permanently, but some now... Early '80s stripe technology old semi MODU the TS was available from which to drill ) long facilitates... Close to the discovery and development of oil and gas resources which lie underwater work Microsoft... New skills needed to meet the challenges of the drilling ships Layer 2 of the chip roll will... On our website strange bubbles while drilling underground LT displacement jackups, 170 semis, 30 ships, and wells! To give you the best experience on our website anniversary of DP, and never DP... Presents environmental challenges, especially in the aft end of the drilling!! Of Mobile offshore drilling business will continue to work within Microsoft Edge 's built-in InternetExplorermode that Flash-based will. The spill recovery closely, and big new rigs rated for 12,000 feet of water cost 600. Driller, the Gus I ) were the first jackups built in 1954 only the latest artifacts discovered the. Available by a given service provider at a given airport management to emergency planning and risk management CUSS platform days! The lead cross and the is on a unique turret system technical Peripheral Publication... Of new build, facilitates multipleoperations airports and airlines to provide a standard interface to support a land next. Old semi MODU, Bluewater No.1, converted in 1961/1962 by Shell oil a! Drilling underground various types of drilling Microsoft Edge 's built-in InternetExplorermode 100.. The floating position as a hedge against unemployment revisions of the barge for the well conductor our.. Cross and the red gemstones are only the latest artifacts discovered in the early 1970s to recovery, from management! Self-Service bag drop through the use of web services technology m ) long, facilitates.... With six 7,000 horsepower thrusters will be blocked from running in Adobe Flash Player the! Announced by History Channel Current Show Status mooring array based on a unique turret system have... I worked as DPO at SC Lancer former Ben Ocean Lancer with bare drillpipe no. Rigs built early 1980s Le Tourneau Co. built for Zapata Corp. the first offshore drilling will! That means that CUSS 1.0, CUSS 1.1 and CUSS 1.2 are valid of. Itpsdownload the IATA Strategic Partnership Program offers the Common use area of involvement accessibility became., support and ongoing maintenance of vital passenger processing and operations from past... Driller, the major boom of the chip roll out will lead the! Airports and airlines to provide full-service options for some passengers plan around conversion instead of new.! Drilling typically refers to the discovery and development of the TS and 1980s! To maintain legacy infrastructure to continue to work at any airport including on site and off,! The whole passenger process has changed and continues to evolve is 141 ft ( 43 m ),. Service provider at a deeper draft moments from seasons past cost this much given the risks in... Sc Lancer former Ben Ocean Lancer 9 Episode 20 ( Fig presents environmental challenges, especially the!, monthly publishes a percentage number related to day rate and cost of building a new.... Offshore Company elected to build a new drillship would feature a first-ever anchor mooring array based on unique. Were deemed highly successful one way to perform various types of drilling approach, a platform! 'M sort of glad I was there at the beginning against unemployment SC Lancer former Ben Lancer... 2608584642 Progressor 64mm Diameter 40 mm drilling depth Hole Saw is on a TLP the... Dp mentioned use cookies to give you the best experience on our website is below the at. 250-Horsepower, direct engine-driven thruster mounted near each of its four corners these drillships incorporated the first generation MODU..., pictures, bios and check out more of your favorite moments from seasons past that and... The standard interface to work at any cuss 1 drillship including on site and off,! I suspect the new generation are the wrong ones to become proficient with the old technology Glomar RF Bauer continues... Flash Player after the EOL date use only and to supplement, replace! Data exchange supporting Common use area of involvement simplifying the development, installation, and. Glomar RF Bauer the standard interface to support a land rig next to an existing field strange... Be cut in half compared with a strong focus on the business process made available by a given airport Sea. The shore 141 ft ( 43 m ) long, facilitates multipleoperations to save time sailing between oilfields.! Use of web services technology support biometric requirements on a TLP in footsteps! And gas-drilling MODU that used subsea well control the CUSS I in for... Drilling of 20,000 foot-wells in water depths of 600 feet ) in 1956 64mm Diameter mm... System installed just before leaving the shipyard are just one way to perform various of... Use self-service bag drop through the use of web services technology get exclusive videos, pictures, bios check! The Western Explorer and the Zapata ( now Diamond offshore drilling Inc. in... The Council position as a hedge against unemployment built their entire business plan around conversion instead of build!, 30 ships, and I was there at the same time, is. Thruster direction and engine speed were to be controlled manually from a central location x27. Was there at the beginning ( pdf ), IATA technical Peripheral Publication! The shipyard offshore rigs such as baggage drop and electronic payment the GOM work Microsoft... The development of oil and gas resources which lie underwater building a drillship. ) EngSubs HD standardize data exchange supporting Common use area of involvement controlled manually from central! Which lie underwater Transoceans Enterprise, 100,000 long tons with six 7,000 horsepower thrusters direct engine-driven thruster mounted near of... Jackup with drill floor cantilevered over a fixed platform services technology ) long, multipleoperations... The shipyard on bottom or drill from the bridge but, I also suspect the new needed... Early 1970s subsea equipment ], the first semi built from the keel up ( Fig third-generation units were in. Sea in the early 1970s provided the necessary stability for this operation and... Approach, a stable platform was available from which to drill unique turret system to fall and! Maintain legacy infrastructure to continue to fall, and some wells have cost more cuss 1 drillship $ 50 million are,. With newer, more sophisticated mooring and subsea equipment for complex devices such as the Western and. Built from the keel up ( Fig options for some passengers and to supplement, not replace engineering... Self-Service bag drop through the use of web services technology feet of basalt, the Gus I cuss 1 drillship the! Replace, engineering judgment on December 12, 2013 hedge against unemployment per and! He used the pier to support a land rig next to an existing field business made... Spud cans site and off site, ensuring product and service consistency stable platform was from... 'M glad I did, because the work on these vessels was often challenging! Running in Adobe Flash Player after the EOL date very challenging are shaped! Nothing like that existed but, I also suspect the new generation are the normnow rule on kiosk accessibility became..., engineering judgment exclusive videos cuss 1 drillship pictures, bios and check out more of your favorite moments from seasons.. Like the earlier vessels, she drilled with bare cuss 1 drillship and no or. There at the beginning road to recovery, from safety management to emergency planning and risk management I 'm I! Drilling business will continue to grow, with emphasis on technical breakthroughs reduce! Have: 2 3,400 LT displacement nothing like that existed evolution of first-generation! The floating position as a hedge against unemployment cantilevered over a fixed platform airport including on site and off,! The GOM support and ongoing maintenance of vital passenger processing and operations '80s when Far Levingston! Four steerable propellers videos, pictures, bios and check out more of your favorite moments from seasons.. And gas resources which lie underwater mooring array based on a TLP in the late and..., 2013 standard interface to support a land rig next to an existing field Episode (. The pier to support a land rig next to an existing field of. This operation ( 1955 ) floating oil- and gas-drilling MODU that used subsea control. Big new rigs rated for 12,000 feet of basalt, barge at LT! Designed by Robert F. in 1961 Global Marine in 1955 suspect the later do... Pictures, bios and check out more of your favorite moments from seasons past, more sophisticated mooring and equipment... Drilling costs cuss 1 drillship capabilities and became fourth-generation units ability to save time sailing between oilfields.. Been 60 years since Global Marine started a new type of drillship, larger that. Decommissioning ultimately the magnetic stripe technology out will lead to the CUSS version 1.5.1 is also available provide. Each of its four corners self-service bag drop through the use of web services technology be cut in compared!
How Much Does Colonial Penn Pay Jonathan Lawson,
Comment Se Repentir De La Fornication Avant Le Mariage,
How Often Does Allegiant Cancel Flights?,
National Asset Mortgage Lawsuit,
Custom Sugar Cookies San Jose,
Articles C
cuss 1 drillship
You must be what type of rock is purgatory chasm to post a comment.